This code applies to the construction and acceptance of power transformers (hereinafter referred to as transformers), oil-immersed reactors (hereinafter referred to as reactors), voltage transformers, and current transformers (hereinafter referred to as transformers) for AC voltage levels of 3kV to 750kV; the installation of arc suppression coils may be carried out in accordance with the relevant provisions of this code.Effective date: December 1, 2010.
Editor's review
This code sets out systematic provisions for the construction and acceptance of power transformers, oil-immersed reactors, voltage transformers, and current transformers at AC voltage levels of 3kV to 750kV, and specifies that arc suppression coil installation may be executed by reference, covering the main stages of oil-immersed main equipment installation in substation projects. Its value lies in linking equipment arrival inspection, installation techniques, oil filling and sealing treatment, testing, and acceptance into an executable chain of provisions, reducing quality risks caused by unclear process interfaces. The provisions are engineering-oriented, with accompanying tables and indicators for item-by-item on-site verification. Readers should locate chapters by equipment voltage level and type, focusing on mandatory provisions and acceptance criteria; for key processes such as oil filling and vacuum treatment, it is advisable to cross-reference manufacturer technical documents. This book is suitable as a field reference for substation installation projects and as a basis for preparing construction plans and organizing acceptance documentation.Who it's for
A good fit for
- Substation installation construction personnel who need to complete transformer and transformer installation in accordance with the code
- Power engineering supervision and quality inspection personnel who need to conduct acceptance judgments based on the provisions
- Power design personnel who need to understand equipment installation requirements for civil works and interfaces
- Power engineering students and faculty who need to master national standards for construction and acceptance of oil-immersed equipment
Not a good fit for
- Low-voltage distribution and civil electrical readers—this book focuses on 3kV to 750kV oil-immersed equipment
- Procurement staff concerned only with equipment selection parameters—this book focuses on construction and acceptance
- Beginners without power engineering fundamentals—the provisions are highly specialized and lack explanation of principles
Reading tips
- First confirm the project voltage level and equipment type, then locate the corresponding chapters to avoid reading irrelevant sections.
- Compile mandatory provisions and acceptance criteria into an on-site checklist and verify item by item as work progresses.
- When reading key processes such as oil filling and vacuum treatment, cross-reference the manufacturer's installation and operation manual to understand parameters.
- Before acceptance, review documentation completeness in chapter order to ensure test reports correspond one-to-one with code requirements.
About the publisher
China Planning Press ChinaChina Planning Press is a central-level publishing institution directly under the National Development and Reform Commission. Guided by the mission of "spreading the wisdom of development and reform and serving national economic construction," it publishes academic books on macroeconomic policy, economic research, and business management, as well as engineering construction standards, codes, and quotas. Its catalog of about 2,817 titles focuses on industrial technology and architecture, with representative publications including the Code for Design of Automatic Fire Alarm Systems, the Code for Fire Protection Design of Buildings, the Standard for Design of Building Water Supply and Drainage, the Standard for Fire Protection Design of Petrochemical Enterprises, and the Standard for Geotechnical Testing Methods. Its authors come largely from specialized institutions and competent authorities such as the Shenyang Fire Research Institute of the Ministry of Public Security, SINOPEC Luoyang Engineering Co., Ltd., Shanghai Xiandai Architectural Design (Group) Co., Ltd., and the Ministry of Housing and Urban-Rural Development, the Ministry of Water Resources, and the Ministry of Industry and Information Technology, reflecting a distinctive profile centered on engineering construction standards and codes while also covering academic publishing in economics and management.
Contents
- 版权信息
- 中华人民共和国住房和城乡建设部公告
- 前言
- 1 总则
- 2 术语
- 3 基本规定
- 4 电力变压器、油浸电抗器
- 4.1 装卸、运输与就位
- 4.2 交接与保管
- 4.3 绝缘油处理
- 4.4 排氮
- 4.5 器身检查
- 4.6 内部安装、连接
- 4.7 干燥
- 4.8 本体及附件安装
- 4.9 注油
- 4.10 热油循环
- 4.11 补油、整体密封检查和静放
- 4.12 工程交接验收
- 5 互感器
- 5.1 一般规定
- 5.2 器身检查
- 5.3 安装
- 5.4 工程交接验收
- 附录A 新装电力变压器及油浸电抗器不需干燥的条件
- 本规范用词说明
- 引用标准名录
FAQ
What voltage levels and equipment scope does the code cover?
According to the source material, it applies to the construction and acceptance of power transformers, oil-immersed reactors, voltage transformers, and current transformers at AC voltage levels of 3kV to 750kV; arc suppression coil installation may be carried out in accordance with the relevant provisions of this code. Before use, confirm whether the equipment type and voltage level fall within scope.Does arc suppression coil installation fully comply with this code?
The source material states that arc suppression coil installation may be carried out in accordance with the relevant provisions of this code, which constitutes reference application rather than full equivalence. In practice, relevant installation and acceptance provisions should be selected in light of the product characteristics and manufacturer technical requirements of the arc suppression coil, and any ambiguities should be confirmed with the design institute.What is the most effective way to use this code on site?
It is recommended to use it process by process: equipment arrival inspection, installation, oil filling and sealing treatment, testing, and acceptance each correspond to relevant chapters. Extract mandatory provisions and acceptance criteria into a checklist. This reduces omissions and facilitates verification before concealed works are covered, avoiding rework.This site is an index: you start “Search all sources” in your browser, and the entries it lists all point to third-party sites; please judge their availability yourself.
About the author
China Electricity Council AuthorThe China Electricity Council (CEC) is a national electricity industry association approved by the State Council in 1988. Voluntarily formed by electric power enterprises and institutions across the country, it is a self-disciplined, non-profit national association registered with the Ministry of Civil Affairs. As a collective author, the CEC focuses on standardization and technical codes for the power industry, organizing the compilation and publication of a large body of industrial technology literature, with 125 works in the library. Its publishing covers transmission and transformation engineering design, construction and acceptance, electrical installation, power distribution equipment, and new energy and electric vehicle charging facilities. Representative works include design codes for 110kV–750kV and 1000kV overhead transmission lines, the standard for construction and acceptance of cable lines in electrical equipment installation, and design codes for wind-solar-storage hybrid power stations and electric vehicle charging stations, providing normative guidance for power engineering practice.